Moana, Journey of Water

Walt Disney World | Orlando, Florida
Under Construction

This water-inspired, Moana themed walking path is glittered with special effects, lighting, audio, structure, and a multitude of other disciplines. For this project, I was a part of a small show set team where I was the primary Revit modeler and BIM Manager. This project required extensive interdepartmental coordination to ensure all of the effects are hidden properly and discrete due to close proximity to guests. Some of my key responsibilities included construction documentation, modeling, and overall coordination of the project. 

Frozen E-Ticket Ride

Tokyo DisneySea | Tokyo, Japan 
Under Construction

This project is a themed ride that guides you through the story based off of the Disney movie Frozen. It is a magical, highly detailed project that will be a beautiful addition to the Tokyo DisneySea portfolio once completed. 

For this project, I was part of the show set team that modeled each of the scenes (rooms), you move through as you progress through the ride. We used the programs Revit and Rhino to 3D model each of the set pieces and brought them into Navisworks for collision and coordination efforts. Once the pieces were modeled, we brought them together in Revit to create construction drawings and a extensive bid package. On top of the computer work, I attended vendor visits to build out and practice construction techniques for scene mockups of our trickier show pieces. My team also utilized AR and VR to help our creative and artistic directors visualize and physically experience the progress of the ride. In addition, I attended physical scale modeling coordination efforts and was in charge of lighting coordination for the project. One of my proudest pieces I aided in was the modeling of the Ice Palace which you can see in the last or third image. 

*All images are concept only and owned by ©Disney

  • Facebook
  • Instagram
  • Pinterest